Emergency service building Assen

This new building had become a recognisable beacon on the edge of the city of Assen. The building accommodates several emergency services such as a firestation, the Area Health Authority and the Safety Region Drenthe. Together with the Koopmans Bouwgroep, VVKH won the design & build competition. The new building is compact, sturdy looking and radiates preparedness for an emergency. All functions have been placed under a single roof, organised around a central atrium. From the atrium there’s a view on the court yard where fireman are practicing. The firetrucks are stationed around the court yard, ready to tear out. Offices are concentrated on the higher floors overlooking the highway A28. The building has a very high sustainability-rating (Dutch GPR-score 8,0).

Architects Gerrit-Jan van Rijswijk
Employees Thomas Gillet
Related

New hotel formula in Hoofddorp

In 2016, we conducted a study on behalf of CTI (Control Towers International) into the possibilities of accommodating a hotel in an existing office building in Hoofddorp. The detached office building with parking garage at the Kruisweg 106 is part of the business park "de Hoek" in Hoofddorp. The building is a stone's throw from Schiphol and Amsterdam and is easily accessible by car and public transport.

We then made the design for the transformation into a hotel with 133 rooms and various facilities, such as a restaurant, bar and lounge.

Based on the study and design, the zoning plan has been adjusted in consultation with the municipality and an interested market party has been contracted: Centro Hotels from Germany. The design was then fully tailored to Centro's wishes. A completely new, trendy hotel formula for the Netherlands will be introduced in the building; the "Ninetynine-hotel Amsterdam", specifically aimed at the younger target group. Vitamin-E has provided the interior design of the Ninetynine formula on behalf of Centro. The new hotel will be a good addition to the current offer in the municipality of Haarlemmermeer.

The demolition work was carried out in 2017, and in November 2018 the transformation of the existing office building into a hotel started.
 
 

This colourfull, functional and energysaving design fully provides in the requirements and ambitions of the Leiderdorp municipality. In 2008 the municipality decided to build a new town hall and was tendered as a design & build contract. Together wit Dura Vermeer Vastgoed, VVKH won the competition. They chose a two-storey building with an atrium and parking on the roof. The atrium forms a vivid space for employees and visitors. This is also where the public counters are situated.
The new town hall is a very sustainable building. In the design we took the whole lifecycle in analyses. The result is very comfortable spaces, environment friendly materials and extremely low energy use. Using renewable energy, this building is CO2 neutral.

The team with VVKH Architects, Dura Vermeer and Besix has been selected for the design and build of a five-story underground parkinggarage in the historical center of Leiden.

Just south of Berkel & Rodenrijs a new fire station has been built to service the suburbs build between Rotterdam and The Hague. Because of the growing number of inhabitants in this region, a future extension is already taken into account in the design. The total plot is covered with a steel mesh in which all future extensions will fit. The façade is covered with corten steel plating wich create the desired sturdy look.